The delivery of the new pump to improve flow on line 3 has been delayed.
The supplier has advised the pump should be installed in two to three weeks time.
The delivery of the new pump to improve flow on line 3 has been delayed.
The supplier has advised the pump should be installed in two to three weeks time.
Leave a Reply
Want to join the discussion?Feel free to contribute!